Download PDFOpen PDF in browser

Time, Cost, and Construction Intensity Comparison between Design-Manufacture-Construct and Traditional Design-Bid-Build Delivery Methods

9 pagesPublished: May 15, 2022

Abstract

The Design-Manufacture-Construct (DMC) technique is a novel delivery method that decreases construction time and cost while increasing construction intensity compared to a traditional delivery method. The purpose of this study was to understand the time, cost, and construction intensity differences between DMC and the conventional Design-Bid-Build (DBB) delivery method. The study utilized semi-structured interviews (SSI) and quantitative data analysis for investigation. The study included interviews with employees from BLOX LLC (a firm specializing in the DMC delivery method) and includes an analysis of data collected on multiple free-standing emergency department (FSED) projects constructed using both the DMC and DBB delivery methods. Descriptive and inferential statistics were used to test hypotheses based on the two delivery methods' time, cost, and construction intensity performance factors to analyze the project data. The results suggested that DMC outperforms DBB in cost performance, supported by inferential statistics data (p≈0.00). Moreover, although inferential statistics do not show any significant difference between DMC and DBB (p > 0.05) concerning time and construction intensity performance, descriptive studies indicated that DMC still performs better than DBB in both these factors.

Keyphrases: business model, delivery method, Design-Manufacture-Construct, Modular Construction, Performance

In: Tom Leathem, Wesley Collins and Anthony J. Perrenoud (editors). ASC2022. 58th Annual Associated Schools of Construction International Conference, vol 3, pages 344--352

Links:
BibTeX entry
@inproceedings{ASC2022:Time_Cost_and_Construction,
  author    = {Yikuan Peng and Jeffrey Kim},
  title     = {Time, Cost, and Construction Intensity Comparison between Design-Manufacture-Construct and Traditional Design-Bid-Build Delivery Methods},
  booktitle = {ASC2022. 58th Annual Associated Schools of Construction International Conference},
  editor    = {Tom Leathem and Wes Collins and Anthony Perrenoud},
  series    = {EPiC Series in Built Environment},
  volume    = {3},
  pages     = {344--352},
  year      = {2022},
  publisher = {EasyChair},
  bibsource = {EasyChair, https://easychair.org},
  issn      = {2632-881X},
  url       = {https://easychair.org/publications/paper/w49r},
  doi       = {10.29007/9hds}}
Download PDFOpen PDF in browser